ALERT! : More info
Translink Buzzer Blog

Posts tagged: expo

This is why there’s a third platform at Stadium – Chinatown SkyTrain station

The third platform at Stadium-Chinatown Station, in use during the 1980s! The third track is the one on the far left of the photo.

 

A SkyTrain sitting at the third track at Stadium-Chinatown Station.

What’s the third platform at Stadium-Chinatown? Well, if you go to the regular platform to board a SkyTrain, you’ll clearly see there’s ANOTHER platform across the SkyTrain tracks and behind the fence, sitting empty. Have a look at the photo on the right to see what I mean.

 

Read more »

Running Rail replacement begins February 5, 2017

2015 Running Rail work

2015 Running Rail work

**UPDATE** Due to snow and ice, this work for February 5 to February 8 is cancelled. Work is set to begin on February 13 if weather permits.

An important part of delivering transit service to the region is keeping our system in a good state of repair.

Sometimes that means rewiring trolley wires, station upgrades, bus refurbishments, rail work or a variety of other necessary maintenance projects.

The Running Rail Replacement Project on the Expo Line will begin on February 5 to February 8 and February 13 to February 15 starting at 9:30 p.m. as part of the SkyTrain Rail Asset State of Good Repair Program.

So far, we’ve replaced 15,013 linear metres of running rail!

  • 800 linear meters west of Main Street Station (1997)
  • 1,575 linear meters between 22nd Street and New Westminster Stations (2001)
  • 1,506 linear meters between Waterfront and Burrard Stations (2001)
  • 1,282 linear meters between Main and Stadium Stations (2003)
  • 1,200 linear meters at the curve west of Broadway Station (2006)
  • 1,400 linear meters at the OMC Gatehouse curve (2008)
  • 1,500 linear meters at the curve west on New West Station (2009)
  • 1,200 linear meters at Edmonds outbound curve and OMC2 inbound curve (2011)
  • 1,650 linear meters at OMC2 outbound curve and Edmonds Station inbound curve (2015)
  • 2,900 linear meters at Broadway Station “S” curve (2015)

During this phase, we will be replacing 5,000 linear metres of running rail at four main locations close to Metrotown, Main Street–Science World, Stadium–Chinatown and Waterfront stations.

What to expect

Due to the complex nature of scheduling this required maintenance project, we will complete this work in various phases at each location.

In order to complete this work, single tracking will occur around where the work is being done.

To help customers get where they need to go during this time, SkyTrain will also be slightly modified.

  • From 9:30 p.m. until the end of service, Expo Line trains will be single tracking (trains travel on the same track in alternating directions) at Main Street–Science World and Commercial–Broadway stations.
  • During this time Expo Line trains will only operate between Waterfront and King George stations. There will be no Expo Line trains to Production Way–University.
  • Expo Line trains between Columbia and Production Way–University stations will be temporarily replaced with Special SkyTrain Service trains operating between New Westminster and VCC–Clark stations.
  • Passengers from other stations on the Expo Line can change trains to this service at New Westminster and Columbia stations.
  • Millennium Line and Canada Line will operate normally.

SkyTrain pattern change 1We will provide more specific information on upcoming work and how this may impact your travel as the project continues into June 2017.

**PLEASE NOTE** This work is weather dependent. Please check the Alerts page for updates.

Thank you for your patience as we work to keep the Expo Line safe and reliable for years to come.

For more information on the Running Rail Replacement Project visit On Track.
Updates to single tracking will be posted to Transit Alerts.
Have questions? Ask away!
By phone: 604.953.3333
Online: @TransLink

Author: Adrienne Coling

Then and Now: 30 years of Expo

Expo 86

It was 30 years ago…

May 2nd marks the 30th anniversary of Expo ’86 – the 1986 World Exposition on Transportation and Communication held on the north shore of False Creek. North America’s largest World’s Fair was a monumental event for Vancouver that left a lasting legacy, notably, Metro Vancouver’s first Rapid Transit SkyTrain – the Expo Line, built for and named in anticipation of the fair. SkyTrain debuted as the first and one of the longest, fully-automated, driverless, rapid transit systems in the world

“Transportation and Communication: World in Motion – World in Touch” coincided with Vancouver’s centennial celebration and was opened by Prince Charles and Princess Diana.

expo prince and princess

Prince Charles and Princess Diana riding the Expo Line in 1986

 

Charles and Di

The Royal Couple

A lot has changed in 30 years, and we’ve summarized some fun facts below about SkyTrain, Metro Vancouver, and BC in general.

  1986 2016
Main line track (km) 21 58
Stations 15 33
Annual boardings (millions) 20 (1987) 80
Fleet (cars) 114 258 (+28 by mid-2016)
One-zone cash fare (at Jan 1) $1.15 $2.75
Metro Vancouver population 1.38 million (census) 2.54 million (BC Stats projection)
Detached home price $130,800 $1,816,487
Minimum Wage (per hour) $3.65 $10.45
Expo 1986

Can you spot the station?

ticket1986

Do you remember these tickets?

expo 86

The very first Ticket Vending Machines

Do you have an Expo ’86 memory you’d like to share? Did you take SkyTrain when it first launched?

Author: Sarah Kertcher