Translink Buzzer Blog

Posts tagged: BC Parkway

Q&A: Bike Parkades support active transportation in Metro Vancouver

Derek Yau is a transportation engineer with TransLink. He looks after the region’s bike facilities.

Did you know 107,000 trips are made each day by cycling in Metro Vancouver?

As Metro Vancouver’s transportation authority, it’s our job to help support and grow the number of bike trips. How do we do this? We help provide connections to the wider transportation system of the region by making transit more bike-accessible.

The Bike Parkade at Joyce–Collingwood Station on opening day

That means including spaces on transit for bicycles, managing the Major Road Network (including five bridges), providing cycling options such as the BC Parkway, Central Valley Greenway and Canada Line Pedestrian–Bicycle Bridge, and developing the Regional Cycling Strategy.

We also invest in Bike Parkades—indoor facilities where registered customers can store their bikes for the day and connect directly to transit. The latest facility opened at Joyce–Collingwood Station just last month, joining the parkades at Main Street–Science World and King George stations.  Read more »

BC Parkway construction is now complete!

Exciting news in time for Bike to Work Week! Improvements to the BC Parkway are now complete, so grab your two-wheeler and go for a twirl. These improvements, made over the summer and into fall, will enhance safety and the overall experience for cyclists and pedestrians.

What is the BC Parkway?

The BC Parkway is a 26-kilometre, multi-use path that roughly parallels SkyTrain’s Expo Line, connecting Surrey City Centre, New Westminster, South Burnaby and Vancouver. It’s an important facility for pedestrians, cyclists and wheelchair users in the region as it makes it easy for pedestrians and cyclists to connect to all Expo Line stations and encourages multi-modal transportation.

Continual improvements to the facility help keep the parkway in good condition and increase the safety and accessibility of the path while allowing users to get around with greater ease.

Here’s a quick look at what we did:

  • Removed and re-graded three retaining walls near Gilley Avenue;
  • Removed the wood pedestrian bridge near Bonsor Avenue, raising the BC Hydro vault and re-graded the path; and
  • Replaced the wood-tie retaining wall near Patterson Station.

Before and after pictures of the work done near Patterson Station (left) and Bonsor Avenue (right)

 

Did you know? TransLink is responsible for more than transit.

Author: Christina Jakopin

More BC Parkway renovations are complete!

new wayfinding sign 1 crop

New wayfinding signs along BC Parkway show the distance to your destination!

It’s update time!

More BC Parkway renovations have been completed!

Here’s a quick look at what’s been improved:

  • Wayfinding signs along the whole 26 kilometre length that include destinations and distances
  • Lighting, crossing safety and accessibility improvements in key areas
  • Pavement rehabilitation of approximately 2.6 kilometres in particularly rough segments

BC Parkway is an important facility for pedestrians, cyclists and wheelchair users in the region.

The path connects Surrey City Centre, New Westminster, South Burnaby and Vancouver and provides a facility for walking and wheeling around the area.

Continual improvements to the facility help keep the parkway in good condition and increase the safety and accessibility of the path while allowing users to get around with greater ease.

Make sure to read our past BC Parkway posts to see the progress with these improvements. See you on the parkway!

Author: Laura Tennant

Psst….psst…do you use the BC Parkway?

BC PArkway

Accessibility and safety improvements are coming to the BC Parkway.

 

I’ve got good news if you cycle or walk along this 26-kilometre, multi-use path. We are making safety and accessibility improvements along the BC Parkway which connects Surrey, New Westminster, South Burnaby and Vancouver.

These improvements include:

  • Realignment of the BC Parkway, away from darker areas and bushes and closer to the road at Nanaimo Station, and along Slocan and Rupert streets.
  • New lighting on parts of the parkway in Vancouver, New Westminster and Surrey for increased visibility for BC Parkway users.
  • A new designated route at Nanaimo and Patterson SkyTrain stations to separate cyclists from vehicles and pedestrians.
  • Widened and paved paths, with new ramps replacing steps at Slocan and Rupert Streets. This improves accessibility for parents with strollers, people in wheelchairs and scooters, and cyclists.

Minor detours will be in place at specific sections of the BC Parkway during construction. Cyclists should watch for signs along the corridor.

For more details on the BC Parkway, check out our previous posts here and here or visit our website.

Author: Angela Salehi