Translink Buzzer Blog

Posts tagged: Pattullo Bridge

Province to build and assume ownership of new Pattullo Bridge

This morning, the Province announced they will fund and deliver the Pattullo Bridge replacement, including:

  • A new four-lane Pattullo Bridge upstream from the existing bridge
  • Removal of the existing bridge

The new Pattullo Bridge will be owned, operated and maintained by the Government of British Columbia. The Province estimates construction will begin in summer 2019 and complete by 2023.

Read more »

Happy Birthday Pattullo Bridge

Pattullo Bridge 1937

Eighty years ago today, on November 15, 1937, Premier “Duff” Pattullo’s namesake bridge opened to traffic crossing the Fraser River. Built in just a year, the Pattullo Bridge replaced the old two-deck bridge, known today as the New Westminster Rail Bridge.

The Pattullo Bridge was originally tolled at 25¢ per crossing, but was removed in 1952.

Read more »

Upcoming Pattullo Bridge Lane Closures

Heading back to New West after a wonderful family day.

A post shared by Jamie Cross (@acrohiker) on

On Wednesday, November 15, 2017 the Pattullo Bridge turns 80 years old! Much like an annual physical, we undertake ongoing inspections to ensure the bridge remains safe until its replacement is completed in 2023. We will be closing two lanes of the bridge each night from November 13 – 16, and then again on November 20 to allow a snooper truck to inspect the underside of the bridge deck. Read more »

Pattullo Bridge weekend closure July 14 – 17

The Pattullo Bridge is celebrating its 80 birthday this year, and as part of regular maintenance and repair work to keep the bridge operational until it’s replaced, the bridge will be closed from Friday, July 14 at 9 p.m. to Monday, July 17 at 5 a.m. This closure will allow crews to repair the south side of the bridge.

Read more »

TransLink 2016: A year in review

Squared
Another trip around the sun. 2016 – what a year! It’s been a busy and productive 366 (leap year) days for TransLink.

Let’s take a look back at 2016 in the world of Metro Vancouver transit!

New CEO.

In the spring, we welcomed new CEO, Kevin Desmond. Kevin came to TransLink from King County Metro Transit that serves the Seattle area.

Kevin jumped in with both feet to lead the charge of a very full and important year while emphasizing our customers’ needs, transparency and excellent service.

We’re so happy to have him at the helm!

Compass.

This word was on everyone’s lips this year!

Compass Card tap outAfter a roll out that started with Upass users then West Coast Express, the general public adopted Compass with Monthly Passes at the beginning of this year.

Then, on April 4, 2016, the fare gates closed requiring riders to tap in on buses and in and out at all gates to pay their fare.

With Compass, you can travel seamlessly across the TransLink transit network with one card! Compass also allows us to gather important data on peak periods, bus route ridership and more – helping us better plan and run the transit network.

Expo ’86.

May 2nd marked the 30th anniversary of Expo ’86 – the 1986 World Exposition on Transportation and Communication held on the north shore of False Creek.

This was North America’s largest World’s Fair and a monumental event for Vancouver that left a lasting legacy – our SkyTrain system starting with none other than the Expo Line!

SkyTrain started regular service on January 3, 1986.

100 years of the Buzzer. 

Happy birthday, Buzzer! The print Buzzer hit a major milestone anniversary of 100 years!

This free, on-transit publication began on June 2, 1916 without a name. That soon changed and it has been delivering informative, fun and interesting transit and community related tidbits to the riders of the transit system ever since.

You can pick yours up on your ride or download here.

Federal funding.

PM Justin Trudeau made some lifelong transit friends when he announced more than $900 million will be invested – by the Government of Canada, British Columbia and municipalities – in public transit projects across the province.

This important funding promise allowed the Metro Vancouver Mayors’ Council to present Phase One of the 10-Year Vision for approval. But we’ll get to that soon enough!

LTE connectivity.

Rogers and Fido customers were treated to not one but two connectivity projects allowing riders to use their mobile devices.

In July, the Dunsmuir tunnel downtown Vancouver was connected and in November, the Edmonds tunnel followed suit!

Up next? We will continue to work with Rogers to build out wireless coverage along the Evergreen Extension, Columbia Station and tunnel and in New Westminster.

#Compass1Million.

This summer we hit one million active Compass Cards.

That means that a million riders across Metro Vancouver embraced the switch to Compass and were tap, tap, tapping their way to and from school, home, work and more!

With such great news, we had to celebrate with a fun contest to thank you for using Compass!

Mark IIIs.

These beautiful new SkyTrain cars were the hit of the summer! Especially because the A/C is just oh, so cool!

Press tourThese cars rode across country – on flatbeds – to reach out region.

Each 4-car set is fully articulated (you can walk from one end of the train to the other), has more room for standing passengers, wheelchairs, bikes, strollers and riders with luggage plus, they are more environmentally efficient!

Transit riders and enthusiasts eagerly awaited the first trip on August 18th and our Mark III VIPs got a front seat for the journey!

SkyTrain Wedding.

Something old, something new, something borrowed something… transit? Hey, whatever floats your SeaBus!Congratulations Nathaly and Jeff!

Jeff and Nathaly met on Canada Line and it was their dream to get married on transit.

Enter a white (naturally) Mark II SkyTrain, a full band, wedding guests and one interloping Buzzer blog writer and you’ve got a SkyTrain wedding!

It was a distinct pleasure to document this lovely couple’s big day aboard our beloved SkyTrain at Stadium–Chinatown Station.

I Love Transit Week.

I love transit week is a time for enthusiasts of all ages can say loud and proud, “I LOVE TRANSIT!”

Poems, colouring contests, a special Buzzer, HTC opening tour, kids camp and more – we felt the transit love from riders of all ages at a variety of events.

Interested in participating in next year’s festivities? Keep your eyes peeled for rumblings on the Buzzer blog in spring!

Hamilton Transit Centre.

In one September weekend we said goodbye to North Vancouver Transit Centre and hello to the brand new HTC building in Richmond! HTC

Did you notice? If not, that’s a good thing! CMBC made the seamless transition from one TC to the other and got your buses on the road from their no locale A.S.A.P.

Hamilton Transit Centre has capacity for 300 forty-foot buses, including up to 80 community shuttle buses and 150 Compressed Natural Gas (CNG) fuelled buses.

HTC performs three functions: dispatch, fuel and wash service as well as maintenance for buses servicing the Richmond, New Westminster, Burnaby and Vancouver areas.

Pattullo.

Opened in 1937, this bridge is one of the busiest Fraser crossings in the region. So, it’s unsurprising that while we go ahead with plans to build a new bridge, this ol’ girl needs some safety upgrades in the interim.

We know the evening and weekend closures impacted a lot of drivers and we appreciate your patience as we rehabilitated the crossing to ensure its safety for all.

Repairs included:

  • milling off the asphalt surfacing from the deck
  • removing all deck concrete down to the top layer of rebar
  • repairing concrete delamination and cleaning or replacing rebar
  • repaving the deck area with a concrete overlay

Crews managed to finish early allowing for goods and people to move freely over the Pattullo Bridge once again .

CUTA.

CUTA is the Canadian Urban Transit Association and this year’s Fall Conference and Transit Show happened right here in Metro Vancouver on November 5-9.

This year’s theme was Inspiring Sustainable Change with a variety of seminars and speakers discussing today’s demands, tomorrow’s challenges and the possibilities for transit in our country and around the world.

TransLink had many speakers engaging with experts and transit enthusiasts from around the globe. Including CMBC’s Derek Stewart who spoke about the impact of climate change to transit agencies.

New Westminster upgrades.

We are upgrading SkyTrain Stations across the rapid transit network.

New Westminster was one of them. I say was because the work is done! On November 21, we officially completed and opened the overhauled station for riders to use and enjoy!

The completed upgrades at New Westminster Station include:

  • A new elevator and escalators to improve access for customers with disabilities
  • Improved lighting throughout the station
  • Glass panels to replace the mesh screens and improve station visibility from street level
  • Better integration with the surrounding community to make it easier to connect to and from the SkyTrain system
  • New public art that improves the experience of riders

10-year vision.

Our region is growing and along with that comes greater need for public transit.640x194_buzzer_blog-01

The Mayors’ Council 10-year Vision Phase One was approved by the TransLink board and council on November 23.

Along with the federal and provincial funding promised in June, municipalities will pitch in their share with TransLink for some much needed transit upgrades and projects.

Phase One improvements in 2017, 2018, and 2019 include:

  • 10% increase in bus service
  • 15% increase in HandyDART service
  • 20% increase in rail service
  • New or expanded transit services for neighbourhoods that currently have few or no transit options today
  • Safer walking and cycling routes
  • Reduced traffic congestion by fixing bottlenecks on major roads

Metro Vancouver residents will start to see added service in the new year with much more to come in the coming months and years!

Evergreen.

Sometimes, it IS easy being green! EmeansGo

On December 2, the Millennium Line Evergreen Extension opened to great excitement despite the rainy weather!

The community celebration at Coquitlam Central Station ran all day with riders eagerly awaiting the first official ride on Evergreen.

With this extension, TransLink has the longest, automated, driverless rapid transit system in the world!

Twitter Heroes.

If you’ve ever called 604-953-3333 or tweeted @TransLink, you’ve interacted with CI (Customer Information).

This crew works tirelessly to help keep riders informed on specific routes, transit timings, disruptions, detours and all things transit related!

Started in 2010 as a pilot project, to date our followers have reached over 135,000 people and CI has sent out 295,039 tweets!

A big thank you to these awesome people who keep us moving!

Well, that about wraps it up. We can’t wait for what 2017 will hold for our region and transit!

Author: Adrienne Coling

New Pattullo Bridge consultations – get involved!

It's time to start talking about connecting to the NEW Pattullo Bridge

It’s time to start talking about connecting to the NEW Pattullo Bridge

Hello Buzzer readers!

Just a quick reminder that starting this Monday, June 13, 2016 TransLink is reaching out to you, the public, for your input on the Pattullo Bridge replacement.

There are both public open houses as well as small group meetings you can attend to learn more and have your voice heard!

Public open houses

These are drop-in sessions and no RSVP or registration is required.

Community Date Time Location
Surrey Wednesday, June 15 5 to 8 p.m. Surrey City Hall
13450 104 Avenue, Surrey
New Westminster Saturday, June 18 10 a.m. to 1 p.m. Sapperton Pensioners’ Hall
318 Keary Street, New Westminster
New Westminster Wednesday, June 22 5 to 8 p.m. Inn at the Quay
900 Quayside Drive, New Westminster
Surrey Saturday, June 25 10 a.m. to 1 p.m. Bridgeview Elementary School
12834 115A Avenue Surrey

Small group meetings

If you’d like to attend one of our small group meetings, please register by emailing pattulloreplacement@translink.ca because space is limited!

Community Date Time Location
New Westminster Tuesday, June 14 1 to 3 p.m. TransLink Head Office
400-287 Nelson’s Court, New Westminster
Surrey Wednesday, June 15 1 to 3 p.m. Surrey City Hall
13450 104 Avenue, Surrey
New Westminster Thursday, June 16 10 a.m. to 12 p.m. TransLink Head Office
400-287 Nelson’s Court, New Westminster
Surrey Monday, June 20 10 a.m. to 12 p.m. Surrey City Centre Library
10350 University Drive, Surrey
Surrey Tuesday, June 21 1 to 3 p.m. Surrey City Hall
13450 104 Avenue, Surrey
New Westminster Wednesday, June 22 10 a.m. – 12 p.m. Sapperton Pensioners’ Hall
318 Keary Street, New Westminster

You can also find these events listed in our calendar.

For more information on the replacement project and informations sessions, visit translink.ca/pattulloreplacement.

Author: Adrienne Coling

Pattullo Bridge upcoming Thursday night closure

Pattullo2

Definitely not a shot taken from the SkyTrain.

As part of the ongoing rehabilitation project, the Pattullo Bridge will be closed to vehicle traffic (the sidewalk will remain open for cyclists and pedestrians) overnight starting from 8 p.m. on Thursday, May 12 to 5 a.m. on Friday, May 13, weather dependent.

We encourage drivers to plan alternate routes to cross the Fraser River during this overnight closure. Transit customers planning on crossing the Fraser River should plan on longer travel times on the N19 NightBus which will re-route via the Alex Fraser and Queensborough bridges.

Drivers are reminded that when the bridge is open, the speed limit is 30 km/h. This ensures the safety of workers and all users of the bridge.

The Pattullo Bridge is one of the oldest bridges in the region. Comprehensive deck rehabilitation work is needed to maintain road safety and bridge functionality. TransLink thanks everyone for their patience while we do this important work.

For additional information on the Pattullo Bridge, including travel resources and upcoming closures customers can:

 

Author: Sarah Kertcher

The Pattullo Bridge review consultation starts today, June 3 – June 28, 2013

Join the Pattullo Bridge Review

Join the Pattullo Bridge Review

Regular readers of the blog and those just generally interested in the infrastructure of the region will know the Pattullo Bridge has reached the end its life cycle and that next steps need to be taken.

Following our consultation we did last year, the Pattullo Bridge review consultation starts today and runs until June 28, 2013.

In short, TransLink, the City of New Westminster and the City of Surrey are working together to review and evaluate alternatives to rehabilitate or replace the Pattullo Bridge and to determine a preferred alternative that meets the needs of communities connected by the bridge, as well as the broader region served by the bridge.

For complete details you’ll want to head over to the Pattullo Bridge Review website. There are a few ways to participate in the process:

Read and fill out the online materials

Read the discussion guide and feedback form.

Complete the online feedback form.

Visit the Pattullo Bridge Review on PlaceSpeak or the City of Surrey on City Speaks.

Send a written submission to info@pattullobridgereview.ca or PO Box 2225, Vancouver Main, Vancouver, B.C. V6B 3W2.

Attend a small group meeting

There are small meetings today, June 6 and June 19. You’ll need to register here.

Open houses

There are six open houses. The first half of the open house will be a drop-in format. The second half will consist of a 30-minute presentation followed by a 60-minute question and answer session. Here they are:

New Westminster – Thursday, June 6, 2013 – 5 p.m. – 8 p.m. – Sapperton Pensioners’ Hall, 318 Leary Street

Surrey – Saturday, June 8, 2013 – 10 a.m. – 1 p.m. – SFU Surrey, 13450 102 Avenue

New Westminster – Tuesday, June 11, 2013 – 5 p.m. – Inn at the Quay, 900 Quayside Drive

Surrey – Wednesday, June 12, 2013 – 5 p.m. – 8 p.m. – SFU Surrey, 13450 102 Avenue

Surrey – Thursday, June 13, 2013 – 5 p.m. – 8 p.m. – City Centre Library, 10350 University Drive

New Westminster, Saturday, June 15, 2013 – 10 a.m. – 1 p.m. – Inn at the Quay, 900 Quayside Drive

So, lots of ways to learn and communicate about the Pattullo. This process is moving forward and we’re glad to help facilitate it!