All bus bays at Phibbs Exchange temporarily relocated, starting July 24
All bus bays at Phibbs Exchange temporarily relocated, starting July 24
Some exciting new upgrades are coming soon to Phibbs Exchange, improving customer comfort and safety, while also providing better traffic flow and capacity for future expansions. In the meantime, we are relocating all bus bays at Phibbs Exchange to accommodate the next stage of construction.
Affected bus routes
Starting July 24 and until the new Phibbs Exchange is complete, all bus bays are relocated to Oxford, Orwell and Main Streets to accommodate for the upgrades. See the below diagram for the updated bus bays:
- Bay 1 (stop #60253): Unloading only
- Bay 2 (stop #60254): R2 Marine Drive RapidBus to Park Royal
- Bay 3 (stop #60255): 209 Upper Lynn Valley, 210 Upper Lynn Valley
- Bay 4 (stop #60256): 245 Capilano University
- Bay 5 (stop #60257): 232 Grouse Mountain
- Bay 6 (stop #60258): 209 Burrard Station, 210 Burrard Station, 211 Burrard Station, 214 Burrard Station
- Bay 7 (stop #60259): 28 Joyce Station, 130 Metrotown Station, 222 Metrotown Station
- Bay 8 (stop #60508): HandyDART
- Bay 9 (stop #60279): 211 Seymour, 214 Blueridge
- Bay 10 (stop #60278): 215 Indian River, 227 Lynn Valley
- Bay 11 (stop #60260): Unloading only
- Bay 12 (stop #60264): 212 Deep Cove
About the Phibbs Exchange upgrade
In partnership with the BC Ministry of Transportation and Infrastructure, the upgraded Phibbs Exchange will feature customer comforts such as better lighting, more weather protection, enhanced signage, and more seamless pedestrian and cyclist connectivity. That means new shelters, digital passenger displays, and bike lockers!
We’re excited to bring this project to better connect the North Shore to the rapidly growing Metro Vancouver region. The upgraded exchange is planned to be completed by mid-2024.