TransLink on the Move: Evergreen means Go!

TransLink on the Move: Evergreen means Go!

TransLink on the Move Evergreen

Last week marked the start of our TransLink on the Move series where we’re breaking down some of the highlights of our 2016 Annual Report.

This week, we’re featuring the long awaited Evergreen Extension!

The opening of the Evergreen Extension was a milestone event for TransLink and for Metro Vancouver. This significant expansion of our integrated transit network brings us to 79 km of SkyTrain meaning that TransLink now operates the world’s longest fully-automated rapid transit system!

Included in the Evergreen Extension is a two-kilometre Tunnel (the longest in the SkyTrain network) connecting Coquitlam to Port Moody, a new SkyTrain operating pattern and six new stations connecting riders to more destinations in our region.

The Evergreen Extension boasts beautiful new open concept stations with plenty of glass allowing for natural light, picturesque views and beautiful public art.

If you haven’t yet had a chance to check out the new stations, have a look at some of the shots captured by transit enthusiast Ivan Chan. Or better yet, become your very own #EvergreenExplorer by checking out some of the great java stops along the new route.

Want to know more about highlights to the transit system in 2016?
Stay tuned to the blog for a new feature every week!

Author: Sarah Kertcher