ALERT! More info
Translink Buzzer Blog

Search: bus route buzz

Bus Route Buzz: West Coast Express TrainBus – 701

Bus Route Buzz
701 map

With the opening of the Evergreen Extension, many TrainBus riders will now be able to have faster connection to downtown Vancouver via SkyTrain and the 701.

TrainBus riders will receive more flexibility in travel options with SkyTrains departing every three to four minutes during peak periods.

701

Starting December 19, the 701 will extend to Mission, however it will not stop at Port Coquitlam or Port Haney Stations.

On January 3, the TrainBus will be discontinued.

Travelling to Port Coquitlam Station? Take the 159 or 160 from SkyTrain.

How about Port Haney Station? Take the C43, C46, C47 or C48.

Heading to Mission? Take the 701 Coquitlam Central Station/Mission City Station. You’ll have access to select 701 trips that are now extended from Haney Place to Mission.

This route schedule has more arrivals and departures from Mission than the TrainBus.

Well, that’s all for now, folks! If you’d like to know more, check out the rest of the series including the live stream! Thanks for joining us for Bus Route Buzz and the Winter 2016 Service Changes.

Know before you go ! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Still have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: New service – 191 Coquitlam Central Station/Princeton

Bus Route Buzz
191 map
Great news for Burke Mountain residents!

Introducing the 191 that will provide service to the Burke Mountain neighbourhood, connecting residents to the Evergreen Extension and West Coast Express.

191 Coquitlam Central Station/Princeton

The new service will operate with two-way service Coquitlam Central Station, Johnson Street, Glen Drive, Pinetree Way, David Avenue, completing a counter-clockwise one-way loop in Burke Mountain along David Avenue, Princeton Avenue and Coast Meridian Road.

Service will be provided seven days a week with trips every 30 minutes from 5:30 a.m. to 10 p.m. on weekdays and slightly later start times on weekends.

Lots more information on bus integration and service changes watch our Facebook Live with Denis the planner!

For the final Bus Route Buzz post, we will be looking at the West Coast Express TrainBus. Stay tuned!

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: Anmore and Belcarra – C26

Bus Route Buzz
Explaining the changes for Anmore and Belcarra and the C26 is as easy as 1, 2, 3!

182 Moody Centre Station/Buntzen Lake

1 – The C26 has a new name! It will now be part of the 182 service.

2 – This route provides all day service through Heritage Mountain via Ravine Drive.

3Two new trips per day have been added to improve connections to other services.

All trips are routed via Ravine Drive.

Well, that was easy!

New route for Burke Mountain next time on Bus Route Buzz!

Want more info on Service Changes? Watch our Facebook Live with Denis the Planner!

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: Port Moody and north Coquitlam – 178/C25/C26/C27/C28/C29/C30

Bus Route Buzz
178 C25 C26 C27 C28 C29 C30 map
Community Shuttles in the Tri-Cities, they are a’changin’ – bringing new route names and new routes to Port Moody and north Coquitlam.

A rose by any other name… let’s take a look!

New Routes:

New route list

  • 179 Coquitlam Central Station/Buntzen Lake and 182 Moody Centre Station/Belcarra take the place of the C26.
  • 183 Moody Centre Station/Coquitlam Central Station and 185 Coquitlam Central Station/Landsdowne will provide service to areas previously served by the C27.
  • 184 Moody Centre Station/Noons Creek and 186 Coquitlam Central Station/Hampton Park will be the new name of the C28.
  • 187 Coquitlam Central Station/Parkway (previously C29)
  • 189 Coquitlam CEntral Station/Lafarge Park (previously C30)

The 178 Port Moody Station/Coquitlam Station route is discontinued.

Be sure to check out our next Bus Route Buzz installment as we look at Anmore and Belcarra service.

Lots more information about bus service changes in our Facebook live stream with Denis the Planner. Check it out!

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: 169 Braid Station/Coquitlam Central Station

Bus Route Buzz
169 map
Oh my gosh, we’re back again!

For this edition of Bus Route Buzz, let’s look at route 169.

169 Braid Station/Coquitlam Central Station

With the Evergreen Extension open, customers who travel between Coquitlam and Braid Stations can now use SkyTrain!

To accommodate new building construction on Holly Drive and on Orchard Drive, the 169 will continue on a detour routing southbound until late 2019.

The 169 will reroute all northbound and southdbound trips via Riverview Hospital groups via Holly Drive, with service operating every 30 minutes.

Short and sweet!

Next time on Bus Route Buzz,  get ready for some more NEW routes in Port Moody and North Coquitlam!

As always, you can learn more about bus changes on our Facebook live stream with Denis the Planner!

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: Port Coquitlam and northeast Coquitlam – 159/188/C37/C38/C40

Bus Route Buzz
159 188 C37 C40 map
Ta da!!

Introducing brand new bus service for northeastern Coquitlam and Port Coquitlam!

These routes will now provide direct connections to the new Evergreen Extension.

Community Shuttle buses across the Tri-Cities are also being renamed.

New Routes:

New routes list

  • 159 Port Coquitlam/Braid Station – All trips on the 159 will travel via Pitt River Road
  • 171 Fremont/Coquitlam Central Station and 172 Riverside/Coquitlam Central Station serving the former C37 areas with new service to Dominion Triangle and a direct connection to the Evergreen Extension.
  • 173 Cedar/Coquitlam Central Station and 174 Rocklin/Coquitlam Central Station cover the route previously served by C38.
  • 175 Meridian/Coquitlam Central Station (previously C40) providing a new connection to the Millennium Line Evergreen Extension.
  • 170 Port Coquitlam Station/Port Coquitlam South (previously C36) has no route changes.
  • 188 Port Coquitlam Station/Coquitlam Central Station gets increased capacity.

Stay tuned for the next Bus Route Buzz post where the 169 Braid Station route will take centre stage.

Want to know more about bus planning? Watch our Facebook live stream with Denis the Planner!

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: Southwest Coquitlam – 143/151/153/157

Bus Route Buzz
143 151 153 157 map
Welcome back to Bus Route Buzz!

In this post we’re exploring more of Coquitlam with routes in the southwest area of the city getting more service.

Down to business!

143 Burquitlam Station/SFU

This route connects SFU and Burquitlam Station with a high-capacity all-day service to SFU with articulated, 60′ buses.

This route will no longer serve Como Lake Avenue.

Why shorten the 143? Well, there is vastly different ridership demand on the two segments of the 143.

The section between Burquitlam Station and SFU has higher demand than the section along Como Lake to Coquitlam.

By separating this route, we can adjust service to demand much more easily!

151 Coquitlam Central Station/Burquitlam Station

This route will run seven days a week between Coquitlam Central Station and Burquitlam Station along Como Lake Avenue, picking up the local area removed from the 143 route.

153 Braid Station/Coquitlam Central Station

The 153 extends from Poirier Community Centre to Coquitlam Central Station via Mariner Way.

157 Lougheed Station/Burquitlam Station.

The 157 extends from Poirier Community Centre to Burquitlam Station via Foster Avenue and Cottonwood Avenue.

Stay tuned for the next Bus Route Buzz installment where we’ll examine some route name changes and brand new bus routes in Northeast Coquitlam and Port Coquitlam.

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: Central Tri-Cities – 97 B-Line/160/190/C24

Bus Route Buzz
97 BLine 160 190 C24
This round of Bus Route Buzz is dedicated to the Central Tri-Cities including the 97 B-Line.

97 B-Line

Wave goodbye to the 97 B-Line and hello to Evergreen!

The B-line will be discontinued as of December 19 and riders will now have a rapid transit option with SkyTrain on the Evergreen Extension.

This is much like what happened in Vancouver with the introduction of the Canada Line.

Travelling to school at Port Moody Secondary? The school will continue to be serviced by the 180 (formerly C24) and the 160 route.

We are also increasing the capacity of these routes during peak periods to help accommodate student demand. This means frequency will increase to 15 minutes and the route will now have full size conventional buses.

C24

This route is getting a new name!

The C24 will now be the 180 Moody Centre Station/Lougheed Station and operate with a larger 40-foot conventional bus plus receive 15 minute frequency during peak periods.

The 180 will provide local service on North Road and St. John’s Street, via the College Park neighbourhood as the 160 continues to provide service on St. John’s Road, Ioco Road and Newport Village.

For local bus stops not serve by SkyTrain, take the 160 or 180.

Extended late night service on the N9 between Lougheed and Coquitlam Central Stations creates 24-hou service along the Millennium Line corridor.

Stay tuned for the next edition in our bus route where we look at some routes in Southwest Coquitlam.

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: West End & Downtown – 5/6/C21/C23

Bus Route Buzz
West End downtown map
Back again with the next installment Bus Route Buzz!

Today we’re taking a closer look at the service changes for the West End and Downtown Vancouver, specifically the 5, 6, C21 and C23.

There are new trolley wires that have been installed along Cambie extending the 5 and 6 route.

6 Davie/Downtown

This 6 will now extend along Davie Street to provide better connections to Yaletown, Canada Line and Cambie Street.

Headed to the Expo Line? Transfer from the 5 at Burrard Station or the 5 or 6 at Cambie and Dunsmuir – one block away from Stadium–Chinatown Station.

C21 and C23

These routes are merging into the new 23 Main Street Station/Yaletown/Beach serving Beach Avenue, Yaletown–Roundhouse, Stadium–Chinatown and Main Street–Science World Stations.

The redesign is to make our bus service more useful for people in this area. The conventional buses have over twice the capacity of Community Shuttles reducing the chance of pass-ups and overcrowding.

Stay tuned for the next edition in our bus route where we look at some Central Tri-Cities routes.

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus Route Buzz: 135 SFU/Burrard Station/160 Port Coquitlam Station/Kootenay Loop

Bus Route Buzz
95 B line 160 map

As we mentioned yesterday, the Buzzer blog will be featuring the top 10 affected areas for this year’s Winter Service Changes and integration for the Evergreen Extension.

Today, we’re focusing on three routes; one is out, one is new and one has changed.

Let’s delve in!

95 B-Line

This brand new B-Line provides a more reliable and direct service with limited stop along Hastings.

Here’s the route:

The new B-Line will stop at: Burrard Station, Granville Street (Waterfront Station), Cambie Street/Abbott Street, Main Street, Commercial Drive, Nanaimo Street, Renfrew Street, Kootenay Loop, Gilmore Avenue, Willingdon Avenue, Hythe Avenue, Holdom Avenue, Kensington Avenue, Duthie Avenue and SFU Transportation Centre.

160 Port Coquitlam Station/Kootenay Loop

The 160 will provide local service in Burnaby and end at Kootenay Loop. This route change was made in order to provide better reliability and overall service.

Riders can continue to take the 160 from the Tri-Cities and transfer to the 95 B-Line along Hastings, beginning at Duthie Ave.

Heading downtown? The Evergreen Extension will now provide a faster and more frequent connected between the Northeast Sector and Downtown.

135 SFU

Starting December 19, the 135 is discontinued.

Stay tuned for the next edition in our bus route where we look at some West End and Downtown routes.

Need some more information on these routes? Check out our live stream with transit planner, Denis the Planner!

Plan ahead! Visit Trip Planner to map your route – use December 19 or later as your travel date.
Have questions? Contact Customer Information at 604.953.3333 or tweet @TransLink.

Author: Adrienne Coling

Bus stop changes at 29th Avenue Station

 

Phase one bus stop moves

Route 16 and 33 bus stops will temporarily move as of January 24.

TransLink will be upgrading the 29th Avenue Station Exchange to improve customer access, safety and security.

During this upgrade work, temporary traffic patterns and bus stop location changes will occur.

Until mid-February, the regular stops for the 16 and 33 buses will be moved outside the bus loop.

The number 16 bus bay has been relocated to north side of 29th Avenue.

The number 33 bus bay has been relocated to south side of 29th Avenue.

The upgrades for this exchange will include:

  • A new bus bay to allow all buses to pick up and drop off within the bus loop.
  • Improved lighting, glass shelters and lower profile landscaping to make the bus loop more visible and safer.
  • Three new crosswalks to improve safety and access tot he bus loop and station.
  • New bus stop ID poles with braille and tactile strips to meet accessibility standards and better direct customers.

The entire project is set to wrap up Summer 2017.

For more information about upcoming bus stop changes at this station,
call Customer Information at 604.953.3333 or visit translink.ca/alerts and click the alerts tab.

Author: Adrienne Coling

(Video) TransLink launches Phase One of the 10-year Vision with more SkyTrain and SeaBus service

Banner blog size
Today is a great day because it marks the beginning of more transit for our region!

More transit means expanded region-wide bus and HandyDART services, improvements to major roads to reduce congestion and address bottlenecks plus more SkyTrain and SeaBus to reduce wait times and overcrowding.

These services will be rolled out this year as part of Phase One of the 10-Year Vision for Metro Vancouver Transportation.

“Metro Vancouver’s public transportation system is finally turning a corner after nearly a decade without significant region-wide investment in transit services,” said TransLink CEO Kevin Desmond. “With completion of the Evergreen Extension in December, and this week’s launch of the first transit enhancements included in the 10-Year Vision, Metro Vancouver is starting to see the long-overdue transportation improvements that will get our region moving again.”

What’s new

  • SkyTrain
    • On weekdays – peak service will end 15 minutes later in the morning and last one hour longer in the afternoon and evening rush.
    • On weekends – trains will increase to match weekday off-peak frequency meaning trains will run every 3 to 6 minutes.
  • Canada Line
    • More frequent service during weekday peak hours.
    • 11 per cent increase in passenger capacity during the busiest periods – that means an extra 3,700 passengers in each direction every weekday.
  • Bus and HandyDART
    • 10 per cent increase in bus service.
    • 15 per cent increase for HandyDART meaning 85,000 more available trips annually.
  • SeaBus
    • Doubling SeaBus Service on Sundays and holidays to sailings every 15 minutes from 10 a.m. to 7 p.m.

What’s next

In the coming weeks and months, more improvements of Phase One will be rolled out, including:

  • New or expanded transit services for neighbourhoods that currently have few – or no – transit options today;
  • Safer walking and cycling routes; and
  • Improvements to the Major Road Network.

Keep reading the Buzzer blog for how you can get involved in public consultation for some upcoming Phase Two projects including Surrey-Newton-Guilford LRT and Broadway Subway.

Make sure to follow us on Facebook, Twitter, Periscope, and Instagram to be notified and watch our live stream broadcasts of future events.

A complete list of all the changes taking place this week and the full 10-year Vision is available at tenyearvision.translink.ca.

185K

Author: Adrienne Coling

An important service reminder plus the Buzzer blog wishes you happy holidays!

DSC_0022

Yet again I have roped my colleagues into a group photo – this time, to spread some Christmas cheer to you, all of our amazing Buzzer blog readers.

We strive to bring you informative, fun and interesting transit happenings from our agency and from across the globe.

Thank you for being a part of our online community!

Just as a reminder, with Christmas drawing nigh, transit will operating slightly differently over the next few days.

Christmas Day – Sunday, December 25, 2016

  • Buses will run on a modified Sunday/holiday schedule; some routes will be adjusted from their normal schedule to reflect ridership levels. Use the Trip Planner (with the date of Dec. 25) to check your route and bus times, or read the Christmas Day Schedules below.
  • SeaBus and SkyTrain will operate with a modified Sunday/holiday schedule.
  • West Coast Express and TrainBus service will not operate.

Boxing Day – Monday, December 26, 2016

  • Buses will run on a modified Sunday/holiday schedule; some routes will be adjusted from their normal schedule to reflect ridership levels. Use the Trip Planner (with the date of Dec. 26) to check your route and bus times, or read the Boxing Day Schedules below.
  • SeaBus will operate regular Sunday/holiday service with extended evening trips.
  • SkyTrain will run Saturday service with extra trains running midday to accommodate shoppers.
  • West Coast Express and TrainBus service will not operate.

**Please check the website as timings are subject to change.

Bonus! On Sunday/holiday schedules you only need a one-zone fare to travel across all zones on all modes!

Remember, if you’re enjoying some libations during your merry merriment, please plan ahead for a safe ride home.

The social team will be off on December 24 and back December 28.
If you have questions please tweet @TransLink or call 604.953.3333.

Happy holidays!

Author: Adrienne Coling

Service Changes for Post-Secondary bus routes starts today – December 19, 2016

Courtesy of Chris Cassidy

Courtesy of Chris Cassidy

Winter Service Changes began today, December 19, 2016.

Now that post-secondary schools are out for the holidays, some bus route schedules and frequencies will change to reflect the lower ridership.

School and university trips will return to normal during the first week of January.

Bus routes

25 Brentwood Station/UBC – Temporary

  • Service is adjusted to provide more consistent frequency during weekday morning peak service.

33 29th Ave Station/UBC – Temporary

  • Service is reduced to every 15 minutes during weekday peak periods.

43 Joyce Station/UBC – Temporary

  • Service is reduced to every 15 minutes.

49 Metrotown Station/Dunbar Loop/UBC – Temporary

  • Regular service is reduced to every 10 minutes; Peak service runs every 8 minutes.

84 UBC/VCC–Clark Station – Temporary

  • Service is reduced to every 12 minutes for mid day service only; Peak service runs every 10 minutes.

95 B-Line/SFU/Burrard Station – Permanent

  • Service is reduced to every 5 minutes
  • Service is adjusted to provide more consistent frequency during weekday morning peak service.

99 Commercial–Broadway B-Line – Temporary

  • Service is adjusted to provide more consistent frequency during weekday morning peak service.

144 SFU / Metrotown Station – Temporary

  • Service is adjusted to provide more consistent frequency during weekday morning peak service.

145 SFU / Production Way University Station – Temporary

  • Service is adjusted to provide more consistent frequency during weekday morning peak service.

351 Crescent Beach / Bridgeport Station – Temporary

  • Two AM peak trips have been removed.

410 22nd Street Station / Queensborough / Railway – Temporary

  • Service is reduced to every 10 minutes

480 UBC / Bridgeport Station – Temporary

  • Service is reduced to every 20 minutes.

Have questions about your route? Tweet us @TransLink or call 604.953.3333.
You can find all the Winter Service Changes at translink.ca/servicechanges.

Author: Adrienne Coling

The December 2016 issue of the Buzzer is now on the system

Happy holidays! bordered The December 2016 print Buzzer is now on the system.

Much of this issue is dedicated to Winter Service Changes.

This sheet change is especially important because of the newly opened Evergreen Extension.

Be sure to check out Bus Route Buzz for more information about changes to service around the Tri-Cities.

Remember! Service Changes begin Monday, December 19, 2016.

Also in this issue we introduce our beautiful new SkyTrain extension!!

As always, we have our favourites – Contest Corner, Back Issues and Coming Events!

Happy reading! Pick it up today on the bus, SkyTrain, SeaBus and West Coast Express or you can download it here.

Author: Adrienne Coling